Subfloor Repair & ReplacementRemoval and replacement of damaged plywood, OSB, tongue-and-groove panels and wood plank subfloors. Fastening and edge support are included in the proposed repair scope.
Floor Joist Repairs & BlockingAssessment of affected joists and related framing. Agreed repairs may include joist sistering, connections and blocking beneath unsupported subfloor edges.
Water-Damaged Subfloor ReplacementRemoval of water-damaged or rotted subfloor material and inspection of exposed framing. Repair work is planned after the moisture source is addressed.
1. Remove Damaged MaterialOpen the agreed repair area and remove damaged flooring or subfloor material to expose the supporting framing.
2. Repair Framing & Add BlockingComplete the agreed joist repairs and install blocking beneath unsupported subfloor edges and panel joints. Additional damage is reviewed before extra work proceeds.
3. Install the New SubfloorFit replacement plywood, OSB or other specified subfloor material to the repair area and fasten it to the supporting framing.
4. Prepare for FlooringCheck the repaired surface and panel connections, clean the work area and identify any additional preparation needed for your planned flooring.